Project Scope:
  • Construction of New Asphalt Roads.
  • Construction of sidewalk including construction of drainage gutters, provisions with junctions for future utility lines, construction of tree pits, curbstones and paving of sidewalk.
  • Construction of Stormwater management system.
  • Construction of aggregate base course.
  • Construction of Asphalt wearing course.
  • Lowering/raising the existing utility junctions to the new road surface levels.
  • Installation of road markings including lane lines, road shoulder lines, parking zones, zebra crossings.
  •  Installation of road lights with foundations including installation of all electrical cables required for the road lighting.
  • Design and installation of dewatering pipes

Project Value

85,329,687.67MVR

Inaugurated on

06 Jan2022

Duration

1year

Status

On Going

Project Category

Construction