Design and Build of Ga.Villingili Phase 2 Major Roads
22 August 2022
Updated at: 01 July 2024
- Detailed design of the roads including a storm water management system for the proposed roads
- Construction of sidewalk including construction of drainage gutters, provisions with junctions for future utility lines, construction of tree pits, curbstones and paving of sidewalk.
- Construction of Stormwater management system for the proposed roads.
- Construction of aggregate base course.
- Construction of Asphalt wearing course.
- Lowering/raising the existing utility junctions to the new road surface levels.
- Installation of road markings including lane lines, road shoulder lines, parking zones, zebra crossings.
- Installation of road lights with foundations including installation of all electrical cables required for the road lighting.
- Installation of speed breakers and road sign boards
Project Value
98,330,536.18MVR
Inaugurated on
28 Apr2022
Duration
4months
Status
On Going
Project Category
Construction